Journals
Publish with us
Publishing partnerships
About us
Blog
Advances in Civil Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Advances in Civil Engineering
/
2020
/
Article
/
Tab 2
/
Research Article
Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China
Table 2
Numerical simulation parameters.
Poisson’s ratios
Bulk modulus
K
(MPa)
Shear modulus
G
(MPa)
Density
(kg/m
3
)
Segment
0.17
1.57 × 10
4
1.295 × 10
4
2500
Grouting layer
0.2
4.57 × 10
2
3.96 × 10
2
2500