Research Article

Parametric Study on the Ground Control Effects of Rock Bolt Parameters under Dynamic and Static Coupling Loads

Table 15

Roof subsidence with different grouting lengths.

Dynamic time (s)Roof subsidence (mm)
S = 600 mmS = 1000 mmS = 1400 mmS = 1800 mm

T = 0.00 s81.7956.2755.8655.95
T = 0.02 s81.7956.3455.9656.03
T = 0.04 s80.7267.8166.0567.47
T = 0.06 s84.1877.2275.9576.83
T = 0.08 s99.51110.70109.87110.23
T = 0.10 s164.10171.14170.12159.53