Research Article

New Construction Technology of a Shallow Tunnel in Boulder-Cobble Mixed Grounds

Table 1

∅25 ultimate pull-out strength of bolts.

NumberBolt conditionActual penetration length (m)Ultimate pull-out strengthCauses of terminationGripping force corrected value (kN)

3Including drill1.3862.5When loaded to 62.5 kN, it suddenly fell back to 22.1 kN and could not continue to increase37.4
5Including drill1.2474.3Loading to 74.3 kN reduces the drop to 28 kN47.6
7Including drill1.3572.2Loading to 72.2 kN reduces the drop to 30.2 kN49.9
9Including drill1.5082.5Achieves a predetermined value of 100 kN≥80.0
3Excluding drill1.7192.2Loading to 92.2 kN reduces the drop to 42.0 kN70.1
4Excluding drill1.94100Achieves a predetermined value of 100 kN≥80.0
5Excluding drill1.6086.6Loading to 86.6 kN reduces the drop to 38 kN64.5
6Excluding drill1.78100Achieves a predetermined value of 100 kN≥80.0