Research Article

Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv

Figure 1

Illustrations of the receiving shaft: (a) the surrounding environment and (b) the design plan of the shaft.
(a)
(b)