Research Article
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Figure 11
Shield tail sealing: (a) highly elastic steel wire balls are manually inserted into the tail of the shield; (b) photograph of the highly elastic steel wire balls.
(a) |
(b) |