Research Article
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Figure 15
Removal of glass fiber-reinforced plastic and concrete: (a) using divers to cut off glass-fiber reinforced plastics and (b) using a crane to remove large blocks of concrete.
(a) |
(b) |