Research Article

Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv

Figure 15

Removal of glass fiber-reinforced plastic and concrete: (a) using divers to cut off glass-fiber reinforced plastics and (b) using a crane to remove large blocks of concrete.
(a)
(b)