Research Article

Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv

Figure 16

Completion of shield recovery: (a) drainage of the shaft and (b) recovery of the tail of the shield from the portal.
(a)
(b)