Research Article
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Figure 16
Completion of shield recovery: (a) drainage of the shaft and (b) recovery of the tail of the shield from the portal.
(a) |
(b) |