Research Article
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Figure 6
Schematic drawing of shield recovery in the shaft: (a) the shield breaking through the diaphragm wall and (b) the excavation gap.
(a) |
(b) |