Research Article
Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
Figure 8
Design of the concrete cradle: (a) front view of the cradle and (b) side view of the cradle.
(a) |
(b) |