Comparison of different methods of shield recovery.

Recovery methodApplicable strataApplication effectEvaluation

Shield recovery with receiving end reinforcementDeep mixing cement pileSilt, sandy soil, silty soil, peat soil(1) Little soil disturbance; (2) no joint in the whole length of pile with full mixing of cement and soil; (3) good water sealing performance; (4) little environmental pollution, noise, and vibration during construction.(1) Large site area required; (2) poor reinforcement effect when reinforcement depth is more than 15 m.
High-pressure rotary jet grouting pileSilt, sandy soil, silty soil, loess, plain fill(1) Small footprint; (2) little vibration and noise; (3) potential for environmental pollution.(1) Good control of position and scope of slurry injection; (2) tight connection between piles.
FreezingWater bearing strata(1) High strength of soil reinforcement; (2) good water sealing performance; (3) no environmental pollution.(1) Good strength and impermeability of soil is good, making it a relatively safe construction method; (2) produces a frost heaving and melting sinking effect, which has a great influence on the surrounding area; (3) long construction period and high cost.
Rodin jet pile methodVarious strata and complex site environment(1) Large pile diameter; (2) pile of good quality; (3) small footprint; (4) low environmental impact.(1) Guaranteed reinforcement quality with large depth; (2) high construction efficiency and low cost.
Metro jet system methodVarious strata and complex site environment(1) Large pile diameter; (2) pile of good quality; (3) small footprint; (4) low environmental impact.(1) Complex construction technology and low construction efficiency; (2) high construction cost.

Shield recovery with no receiving end reinforcementSteel sleeveStrata with high permeability and water content(1) Safe construction; (2) short construction period; (3) reusability.(1) Wide applicability; (2) avoids pipeline relocation; (3) provides environmental protection.
Underwater recoveryWater bearing strata with high permeability and bearing capacity(1) Short construction period; (2) environmental protection; (3) small environmental impact.(1) Suitable for shafts that do not allow for end reinforcement owing to site constraints and that have strata with a degree of self-stabilization.