Research Article
Seismic Performance Assessment of Reinforced Concrete Frame-Shear Wall Structures in Hydropower Plants Based on Material Damage
Table 5
Engineering limit state and damage state prediction.
| (g) | EDP | Engineering limit state | Damage state |
| 0.08 | | Concrete cover cracking onset | Negligible | 0.10 | ; | No or slight compressive damage | Negligible | 0.32 | | Concrete cover spalling onset | Light | 0.36 | | Plastic hinge initiating | Light | 0.59 | | Concrete core crushing onset | Moderate | 0.65 | | Steel bar yielding | Moderate |
|
|