Research Article

Study on Identification of Construction Method for Ultra-Large-Span Tunnel

Table 12

Calculation results of Malin tunnel construction method.

ItemQuantitative index

One-step span15.9
Overall span19.9
Number of calculated lateral drift1.2
Number of determined lateral drift2.0
Determined one-step excavation span9.94
Index of surrounding rock stability F27.81
Stability of surrounding rockVery stable
Recommended methodCD method