Research Article

Study on Identification of Construction Method for Ultra-Large-Span Tunnel

Table 7

Macro form of test combination at each level of factor A.

No.Excavation span (A)Code of test combinationsMacro form of the test combinations

11A1B1C1、A1B2C2、A1B3C3、A1B4C4、A1B5C5A1B(5)C(5)
22A2B1C2、A2B2C3、A2B3C4、A2B4C5、A2B5C1A2B(5)C(5)
33A3B1C3、A3B2C4、A3B3C5、A3B4C1、A3B5C2A3B(5)C(5)
44A4B1C4、A4B2C5、A4B3C1、A4B4C2、A4B5C3A4B(5)C(5)
55A5B1C5、A5B2C1、A5B3C2、A5B4C3、A5B5C4A5B(5)C(5)

Note. B(5) represents the combinations of five levels of factor B and C(5) represents the combinations of five levels of factor C.