An Analysis of Construction Failure Factors to Stakeholder Coordinating Performance in the Finishing Phase of High-Rise Building Projects
Table 4
Factors with significant different construction failure perceptions of groups under t-test.
| Construction failure factors | Levene's test for equality of variances | t-test for equality of means | Assumption | F | Sig. | t | df | Sig. (2-Tailed) | Mean Diff. () | Std. Error Diff. |
| Owners/consultants versus contractors/subcontractors | | | | | | | | | |
| F28 | Unreasonable pressure from consultants and owner/owner representatives | Equal variances assumed | 1.730 | 0.191 | −3.102 | 124 | 0.002 | −0.454 | 0.146 | F20 | Handover of unclear/unready construction grounds to other contractors | Equal variances assumed | 0.289 | 0.592 | −2.803 | 124 | 0.006 | −0.387 | 0.138 | F19 | Insufficient communication between project stakeholders | Equal variances assumed | 0.130 | 0.719 | −2.468 | 124 | 0.015 | −0.330 | 0.134 | F29 | Disputes between project stakeholders | Equal variances assumed | 2.138 | 0.146 | −2.432 | 124 | 0.016 | −0.321 | 0.132 |
| Mean diff. = owners/consultants; Mean – contractors/subcontractors mean |
|
|