Research Article

The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization

Table 2

The indicators affecting the metro tunnel construction cost.

Primary indicatorsSecondary indicatorsType of Indicator

Project aspectsType of shield machine (X1)Quantitative
Geological features (X6)Qualitative
Number of times of shield machine entering and leaving the site (X9)Quantitative
Segment thickness (X10)Quantitative

Construction conditionsConstruction period (X11)Quantitative
Environmental characteristics (X12)Qualitative

Technical standardTunnel structure (X15)Quantitative

Project managementProject management ability of the owner (X16)Qualitative
Project management ability of the construction company (X17)Qualitative
Financing structure of the project (X18)Quantitative