Research Article

The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization

Table 4

Prediction results of different training and testing split ratio.

The training and testing split ratio90% : 10%80% : 20%70% : 30%

Average absolute error5.2787.31312.763
Average relative error (%)1.102.293.98