Research Article

The Prediction of Metro Shield Construction Cost Based on a Backpropagation Neural Network Improved by Quantum Particle Swarm Optimization

Table 5

Error results of the ten-fold cross-validation.

No.12345678910

0.99800.99810.99790.99750.99830.99800.99760.99760.99810.9982
(%)1.291.291.301.341.271.291.331.331.281.27
6.43636.67896.59736.79106.46726.47806.37896.47896.26716.6781
6.0786.38196.38916.47686.3056.26736.37316.27815.73786.2789