Study on Construction Influence of Shield Tunnel of Urban Rail Transit on Large-Section Mining Tunnel

Table 11

Maximum settlement on the surface of each working condition (unit: mm).

Clear distanceBuried depth
1.0D2.0D4.0D6.0D

0.5D−35.8−32.7−16.7−5.1
1.0D−33.9−30.1−14.4−4.9
1.5D−32.3−28.5−12.7−4.7
2.0D−31.7−27.7−11.5−4.9