Research Article
Hybrid Finite-Discrete Element Modelling of Excavation Damaged Zone Formation Process Induced by Blasts in a Deep Tunnel
Figure 28
Effect of spacing between boreholes for EDZ induced by blasts: (a) with the spacing of 0.4 m between boreholes; (b) with the spacing of 0.8 m between boreholes.
(a) |
(b) |