Research Article
Properties and Applications of a New Chemical Grouting Material
Table 11
Tunnel leakage before and after grouting.
| Order number | Sections | Water inflow of track bed surface (L/d) | Water depth in drains (mm) | Before grouting | After grouting | Before grouting | After grouting |
| 1 | K248 + 300 | 0.5 | nil | 18 (water) | 3 (water) | 2 | K250 + 516 | 9 | nil | 36 (mud) | 5 (water) | 3 | K251 + 217 | 32 | nil | 136 (mud) | 4 (water) | 4 | K251 + 400 | 15 | nil | 82 (mud) | 3 (water) |
|
|