Research Article

Properties and Applications of a New Chemical Grouting Material

Table 11

Tunnel leakage before and after grouting.

Order numberSectionsWater inflow of track bed surface (L/d)Water depth in drains (mm)
Before groutingAfter groutingBefore groutingAfter grouting

1K248 + 3000.5nil18 (water)3 (water)
2K250 + 5169nil36 (mud)5 (water)
3K251 + 21732nil136 (mud)4 (water)
4K251 + 40015nil82 (mud)3 (water)