Research Article

[Retracted] Calibration of the Live Load Factor for Highway Bridges with Different Requirements of Loading

Table 3

Ratios for equation (9) and the 15 sites.

SiteMomentLeft shearRight shear
0%10%20%0%10%20%0%10%20%

20.610.620.620.650.650.620.700.680.65
200.680.710.680.700.660.640.720.710.67
220.670.650.680.700.650.680.670.640.65
250.610.620.630.630.630.630.630.650.68
600.660.630.630.680.650.650.670.670.69
700.660.670.720.710.670.780.690.670.74
880.740.650.630.610.670.630.740.710.61
890.640.660.740.630.680.740.690.680.77
900.670.680.730.690.700.730.710.740.77
950.720.770.770.740.780.790.760.770.76
960.710.750.720.750.750.750.770.770.74
1110.670.730.750.710.750.810.720.770.80
1120.670.770.800.680.750.760.70.80.80
1150.720.630.670.770.640.650.670.650.70
8160.670.690.730.730.700.710.670.690.75
Average0.670.680.700.690.690.700.700.710.72
Final value0.70