Research Article

[Retracted] Calibration of the Live Load Factor for Highway Bridges with Different Requirements of Loading

Table 5

Ratios for equation (11) and the 15 sites.

SiteMomentLeft shearRight shear
0%10%20%0%10%20%0%10%20%

20.430.440.470.420.430.390.430.420.37
200.490.480.440.490.450.430.480.450.41
220.570.560.540.580.540.530.530.490.46
250.410.410.410.400.400.400.420.420.42
600.420.430.430.440.420.410.450.450.43
700.550.530.590.570.540.610.550.530.58
880.590.550.430.500.580.450.600.590.40
890.470.510.580.450.500.580.500.500.59
900.540.520.610.550.550.640.560.520.60
950.530.550.600.530.550.640.530.540.59
960.510.530.520.500.520.520.50.510.49
1110.530.570.630.550.600.690.550.590.64
1120.530.600.600.510.600.620.540.610.59
1150.480.480.490.490.460.480.490.510.52
8160.550.560.570.580.560.560.550.540.56
Average0.510.510.530.500.510.530.510.510.51
Final value0.51