Research Article

A Closed-Form Solution for the Analysis of Antifreeze Disease Fortification Length in a Permafrost Tunnel

Figure 1

Frost damage in a permafrost tunnel: (a) pavement freezing; (b) drainage ditch freezing.
(a)
(b)