Research Article

Numerical Study on the Disturbance Effect of Short-Distance Parallel Shield Tunnelling Undercrossing Existing Tunnels

Figure 4

Time history curve of tunnel arch crown settlement of left line of line 1 caused by excavation construction of line 5 (numerical results). (a) Right-line tunnelling. (b) Left-line tunnelling.
(a)
(b)