Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation
Table 3
Name, activity, number, and time of each workstation used for semiprecast slabs.
| Code | Name | Activities | Number | Time (minute) | Min | Most likely | Max |
| 1 | Cleaning workstation | Mold preparing, including mod cleaning, mold platen cleaning, and antiadherent brushing | 1 | 10 | 12 | 15 | 2 | Steel installation workstation | Steel installing, including steel into mold and binding, as well as embedded part laying | 6 | 20 | 25 | 30 | 3 | Checking workstation before concrete pouring | Checking work, namely, whether steel and embedded part and others meet the design requirements | 2 | 10 | 12 | 15 | 4 | Concrete pouring and vibrating workstation | Concrete pouring and vibrating | 2 | 10 | 12 | 15 | 5 | Resting workstation | Initial setting and scratching | 4 | 5 | 7.5 | 10 | Resting | 10 | 15 | 20 | 6 | Stacking crane | Transport to curing kiln | 1 | 5 | 7.5 | 10 | 7 | Curing kiln | Steam curing | 1 | 480 | 480 | 480 | 8 | Mold releasing workstation | Mold releasing | 6 | 15 | 17.5 | 20 | 9 | Buffer area for end face cleaning | End face cleaning | 1 | 5 | 5 | 5 | 10 | Temporary stacking area | Temporary stacking | 1 | 5 | 5 | 5 |
|
|