Research Article
Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation
Table 4
Instantaneous utilization of each resource after 1500 simulations.
| Code | Name | Instantaneous utilization of resource | Average | Minimum average | Maximum average |
| 1 | Cleaning workstation | 0.3057 | 0.2926 | 0.3186 | 2 | Steel installation workstation | 0.1034 | 0.0969 | 0.1092 | 3 | Checking workstation before concrete pouring | 0.1533 | 0.1440 | 0.1634 | 4 | Concrete pouring and vibrating workstation | 0.1529 | 0.1444 | 0.1621 | 5 | Resting workstation | 0.1394 | 0.1292 | 0.1503 | 6 | Stacking crane | 0.1861 | 0.1695 | 0.2051 | 7 | Curing kiln | 0.3053 | 0.2983 | 0.3120 | 8 | Mold releasing workstation | 0.0723 | 0.0686 | 0.0755 | 9 | Buffer area for end face cleaning | 0.1240 | 0.1212 | 0.1267 | 10 | Temporary stacking area | 0.1240 | 0.1212 | 0.1267 |
|
|