Research Article

Factors Affecting Maintenance Probability and Resurfacing Thickness Based on the Pavement Management System

Table 3

The performance indicators.

IndicatorsFull nameDescription

Pre-IRI (m/km)Pretreatment international roughness indexIRI value in the last detection before treatment
Pre-RD (mm)Pretreatment rutting depthRD value in the last detection before treatment
Pre-SFCPretreatment side-way force coefficientSFC value in the last detection before treatment
Pre-TCSI (%/m)Pretreatment transverse cracking severity indexTCSI value in the last detection before treatment
Pre-PPR (%)Pretreatment pavement patching ratioThe patching ratio (including patching and surface pit) in the last detection before treatment
Pre-SDR (%)Pretreatment surface damage ratioThe surface damage ratio (except for transverse crack, patching, and surface pit) in the last detection before treatment
Pre-DRIRI (m/km/year)Pretreatment deterioration rate of IRIThe slope of the pretreatment IRI linear deterioration model
Pre-DRRD (mm/year)Pretreatment deterioration rate of RDThe slope of the pretreatment RD linear deterioration model
Pre-DRSFCPretreatment deterioration rate of SFCThe slope of the pretreatment SFC linear deterioration model