Research Article
Prediction of Highway Tunnel Pavement Performance Based on Digital Twin and Multiple Time Series Stacking
Figure 15
Segment prediction accuracy. (a) 500 m on the east side of the slow lane. (b) 1600 m on the east side of the fast lane. (c) 1100 m on the west side of the slow lane. (d) 1100 m on the west side of the slow lane.
(a) |
(b) |
(c) |
(d) |