Research Article

Application of the Upper-Bench CD Method in Super Large-Span and Shallow Tunnel: A Case Study of Letuan Tunnel

Figure 15

Tunnel model. (a) Overall model. (b) Half-part CD model. (c) CD method model. (d) Both-side drift method model. (e) Construction excavation indication.
(a)
(b)
(c)
(d)
(e)