Research Article
Application of the Upper-Bench CD Method in Super Large-Span and Shallow Tunnel: A Case Study of Letuan Tunnel
Table 6
Statistics of maximum principal stresses for different construction methods.
| Construction method | Maximum tensile stress (MPa) | Maximum compressive stress (MPa) |
| Upper-bench CD method | 0.109 | 0.119 | CD method | 0.201 | 0.15 | CRD method | 0.177 | 0.179 | Both-side drift method | 0.176 | 0.166 |
|
|