Research Article

Assessing the Risk Probability of the Embankment Seismic Damage Using Monte Carlo Method

Table 6

Risk probability assessment results.

Seismic damage levelBasically intactSlight damage (%)Moderate damage (%)Severe damage (%)Destruction (%)

Risk probability exceeding each damage level100.0098.2268.0329.077.62
Risk probability of each damage level1.7830.1938.9621.457.62