Research Article

Research and Application of Support Resistant Limiting Dampers in the Deep-Buried Large-Section Loess Tunnel

Table 4

Engineering quantity comparison table.

Project unitQuantity comparisonScheme III/scheme I (%)Scheme III/scheme II (%)
Scheme IScheme IIScheme III

Soil and rock excavationm3101.44105.69103.04101.697.5
C25 shotcretem38.4311.628.50100.873.1
Steel meshkg105.95146.87106.78100.872.7
Steel used for steel framekg1036.802297.541211.42116.852.7
Steel frame spacingm1.000.601.00ā€”ā€”