Research Article
Research and Application of Support Resistant Limiting Dampers in the Deep-Buried Large-Section Loess Tunnel
Table 4
Engineering quantity comparison table.
| Project unit | Quantity comparison | Scheme III/scheme I (%) | Scheme III/scheme II (%) | Scheme I | Scheme II | Scheme III |
| Soil and rock excavation | m3 | 101.44 | 105.69 | 103.04 | 101.6 | 97.5 | C25 shotcrete | m3 | 8.43 | 11.62 | 8.50 | 100.8 | 73.1 | Steel mesh | kg | 105.95 | 146.87 | 106.78 | 100.8 | 72.7 | Steel used for steel frame | kg | 1036.80 | 2297.54 | 1211.42 | 116.8 | 52.7 | Steel frame spacing | m | 1.00 | 0.60 | 1.00 | ā | ā |
|
|