Research Article
Analysis on Deformation and Stress Characteristics of a Multibraced Pit-in-Pit Excavation in a Subway Transfer Station
Figure 7
Monitoring results of the ground settlement at (a) S11, (b) S12, and (c) S21 during the PIP excavation.
(a) |
(b) |
(c) |