| No. | Description of the item | Measurement units | Value of paid works per road section for period 2015–2019 (€) | Contribution in total value (%) | S1 | S2 | S3 | S4 | S5 |
| 1 | Hot patch asphalt (repair of larger surfaces) | m2 | 1, 101, 509 | 892, 105 | 858, 927 | 729, 203 | 591, 949 | 22.17 | 2 | Protection of slopes with suspended steel wire meshes | m2 | 696, 213 | 483, 358 | 633, 173 | 314, 801 | 601, 186 | 14.49 | 3 | Marking horizontal signalization lines | km | 536, 609 | 495, 607 | 312, 100 | 314, 797 | 401, 497 | 10.94 | 4 | Installation and replacement of safety fence | m | 199, 129 | 271, 258 | 303, 084 | 182, 555 | 229, 004 | 6.29 | 5 | Hot patch asphalt (repair smaller surfaces and potholes) | t | 12, 828 | 235, 571 | 322, 500 | 206, 951 | 128, 283 | 4.81 | 6 | Inspection service | h | 215, 461 | 183, 298 | 122, 467 | 140, 096 | 238, 960 | 4.78 | 7 | Cleaning gutter | m | 151, 941 | 128, 779 | 110, 145 | 207, 225 | 188, 878 | 4.18 | 8 | Cleaning of landslide material | m3 | 134, 357 | 146, 023 | 19, 813 | 228, 236 | 242, 095 | 4.09 | 9 | Cutting shrubs, trees, and grass | m2 | 56, 897 | 143, 633 | 112, 991 | 136, 544 | 148, 651 | 3.18 | 10 | Laying of the levelling wearing course AB 11 | t | 147, 700 | 165, 845 | 97, 221 | 56, 319 | 119, 410 | 3.11 | 11 | Forging slopes from unstable parts of rocks | m3 | 53, 098 | 220, 281 | 14, 885 | 65, 372 | 117, 348 | 2.50 | 12 | Repair of stone walls | m3 | 2,241 | 29,997 | 352,254 | 0 | 10,755 | 2.10 | 13 | Cleaning of drainage channels and ditches | M | 22,037 | 79,487 | 91,205 | 98,386 | 42,086 | 1.77 | 14 | Mechanical scraping-profiling of existing asphalt pavement | m2 | 88,963 | 83,272 | 50,093 | 41,074 | 44,796 | 1.64 | Total | 86.06 |
|
|