Research Article

Proposition of a Model for Selection of the Hybrid Contract Implementation Strategy for a Pilot Project of Regular Road Maintenance in Montenegro

Table 5

Expected values of qm and for selected works.

NoWork itemMeasurement unitsExpected (qm)Expected

1Hot patch asphalt (repair of larger surfaces)m274,92631,966
2Protection of slopes with suspended steel wire meshesm259,77318,005
3Marking horizontal signalization lineskm1,404−335
4Installation and replacement of safety fencem4,132−5,068
5Hot patch asphalt (repair smaller surfaces and potholes)t1,051−429
6Inspection serviceh9,484−48
7Cleaning gutterm720,1512,991
8Cleaning of landslide materialm312,771−257
9Cutting shrubs, trees, and grassm21,649,48662,286
10Laying of the levelling wearing course AB 11t1,178523
11Forging slopes from unstable parts of rocksm35,4972,812
12Repair of stone wallsm32,1281,124
13Cleaning of drainage channels and ditchesm49,44712,255
14Mechanical scraping-profiling of existing asphalt pavementm258,25910,939