| No | Work item | Measurement units | Expected (qm) | Expected |
| 1 | Hot patch asphalt (repair of larger surfaces) | m2 | 74,926 | 31,966 | 2 | Protection of slopes with suspended steel wire meshes | m2 | 59,773 | 18,005 | 3 | Marking horizontal signalization lines | km | 1,404 | −335 | 4 | Installation and replacement of safety fence | m | 4,132 | −5,068 | 5 | Hot patch asphalt (repair smaller surfaces and potholes) | t | 1,051 | −429 | 6 | Inspection service | h | 9,484 | −48 | 7 | Cleaning gutter | m | 720,151 | 2,991 | 8 | Cleaning of landslide material | m3 | 12,771 | −257 | 9 | Cutting shrubs, trees, and grass | m2 | 1,649,486 | 62,286 | 10 | Laying of the levelling wearing course AB 11 | t | 1,178 | 523 | 11 | Forging slopes from unstable parts of rocks | m3 | 5,497 | 2,812 | 12 | Repair of stone walls | m3 | 2,128 | 1,124 | 13 | Cleaning of drainage channels and ditches | m | 49,447 | 12,255 | 14 | Mechanical scraping-profiling of existing asphalt pavement | m2 | 58,259 | 10,939 |
|
|