Research Article
Implementation of Parallel K-Means Algorithm to Estimate Adhesion Failure in Warm Mix Asphalt
Table 6
Serial v/s parallel execution time (sec) for dry condition.
| Sample | K = 2 | K = 4 | K = 6 | K = 8 | K = 10 | Serial exec | Parallel exec | Serial exec | Parallel exec | Serial exec | Parallel exec | Serial exec | Parallel exec | Serial exec | Parallel exec |
| WP170 | 29.21 | 22.53 | 59.43 | 46.07 | 87.65 | 67.60 | 120.86 | 93.14 | 161.08 | 127.68 | HP180 | 29.23 | 22.29 | 59.46 | 45.59 | 87.69 | 66.89 | 120.92 | 92.19 | 161.15 | 126.49 | HO180 | 29.22 | 22.08 | 59.45 | 45.16 | 87.67 | 66.24 | 120.90 | 91.32 | 161.12 | 125.40 | WO150 | 29.19 | 22.36 | 59.38 | 45.72 | 87.57 | 67.08 | 120.77 | 92.44 | 160.96 | 126.80 | WO160 | 29.37 | 22.04 | 59.75 | 45.08 | 88.12 | 66.12 | 121.50 | 91.16 | 161.88 | 125.20 | WO170 | 28.18 | 22.36 | 57.37 | 45.72 | 84.55 | 67.08 | 116.74 | 92.44 | 155.92 | 126.81 | WP160 | 29.47 | 22.04 | 59.94 | 45.10 | 88.42 | 66.12 | 121.89 | 91.16 | 162.37 | 125.20 | WP150 | 29.24 | 22.62 | 59.49 | 46.24 | 87.74 | 67.86 | 120.99 | 93.48 | 161.24 | 128.10 |
|
|