Research Article

An Investigation into the Tunnel-Soil-Pipeline Interaction by In Situ Measured Settlements of the Pipelines

Table 2

Detailed information of the monitored pipelines.

No.TypeMaterialDiameter (mm)Cover depth (m)Wall thickness (mm)JointSection length (m)Installation time (s)

1WaterSteel14002.2612Weld61970
2WaterCast iron30028Socket51980
3WaterSteel8002.555Weld61950
4GasSteel4001.415Weld61980
5GasSteel5001.4114.5Weld91980
6WaterCast iron8001.518Socket51960