Research Article
Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels
Figure 10
Maximum principal stress of the secondary liner in the double-arch tunnel. (a) Plan 1. (b) Plan 2. (c) Plan 3. (d) Plan 4.
(a) |
(b) |
(c) |
(d) |