Research Article

Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels

Figure 5

State of the surrounding rock before and after excavation. (a) Before excavation. (b) Load on B posed by A after excavation. (c) Load on A posed by B after excavation.
(a)
(b)
(c)