Research Article
Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels
Figure 5
State of the surrounding rock before and after excavation. (a) Before excavation. (b) Load on B posed by A after excavation. (c) Load on A posed by B after excavation.
(a) |
(b) |
(c) |