Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels

Table 1

Soil parameters.

StratumH (m)Ρ (g/cm3)K (cm/s)E (MPa)K0 (-)C (kPa)Φ (°)µ (-)

12.01.952.31 e − 224.30.5010.027.00.30
2 B9.02.005.79 e − 39.10.5520.027.40.30
2 A2.211.38 e − 513.00.6028.231.20.24
5–1 B4.02.649.26 e − 33.3 e30.583.4 e435.00.27
5–1 A2.695.56 e − 54.9 e30.633.7 e438.60.24
5–2 B3.62.682.36 e − 48.7 e30.644.1 e439.30.25
5–2 A2.703.81 e − 51.2 e40.684.5 e442.70.23
5–341.42.711.16 e − 54.4 e41.005.5 e451.80.23

h: thickness; ρ: density; K: permeability coefficient; E: elastic modulus; K0: at-rest earth pressure coefficient; c: cohesion; φ: frictional angle; μ: Poisson’s ratio; B: before grouting; and A: after grouting.