Research Article

Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels

Table 2

Material parameters of the supporting structure.

Supporting structureUnit typeZ (cm)γ (kN/m3)E (GPa)µ (-)

Initial supportBeam302534.10.2
Temporary supportBeam302534.30.2
Secondary linerSolid262533.20.2
Final linerSolid802635.00.2
Liner of heading 0#Solid222534.00.2
Middle wallSolid2635.00.2

z: thickness; γ: bulk density; E: elastic modulus; and μ: Poisson’s ratio.