Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels

Table 3

Distribution of stress release ratio in different stages.

PlanStress release ratio in different stagesAccumulative release ratio (%)
Tunnel excavationInitial supportSecondary liner

Plan 1205030100
Plan 2206020100
Plan 3304030100
Plan 4305020100