Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels

Table 6

Fitting equation and actual displacement of each section.

Monitoring sectionFitting equationRelation coefficientActual total displacement

Section 1U = 32.405[exp (−0.106t) − 1]0.9948851.5
Section 2U = 33.504[exp (−0.083t) − 1]0.9866552.0
Section 3U = 31.840[exp (−0.090t) − 1]0.9853149.8