Research Article
Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels
Table 6
Fitting equation and actual displacement of each section.
| Monitoring section | Fitting equation | Relation coefficient | Actual total displacement |
| Section 1 | U = 32.405[exp (−0.106t) − 1] | 0.99488 | 51.5 | Section 2 | U = 33.504[exp (−0.083t) − 1] | 0.98665 | 52.0 | Section 3 | U = 31.840[exp (−0.090t) − 1] | 0.98531 | 49.8 |
|
|