Research Article

Field Test and Simulation Analysis of Thermal Performance of Bamboo Steel Composite Wall in Different Climate Regions

Table 2

Setting items of building models.

Setting itemsValue

PurposeVerificationEnergy performance
LocationNingboHarbin, Beijing, Shanghai, Guangzhou
Area of building24 m2
Building envelopeWall1 + Roof1 + FloorWall1 + Roof1 + Floor,
Wall2 + Roof2 + Floor
Window-to-wall ratioNorth wall: 0.24, south wall: 0.31, west and east wall: 0
Temperature: 18°CTemperature: 16°C (winter),
Air conditionRun time: 2016/1/26–2016/1/3026°C (summer)
Run time: whole year
Weather conditionMeasuredTypical meteorological year
Miscellaneous loads04.3 W/m2