Research Article

Research on the Prediction of the Water Demand of Construction Engineering Based on the BP Neural Network

Table 3

Comparison of three error representations.

Error representations

BP0.7921731.269245.4554
PSO-BP0.995996.090015.7467
GA-BP0.9853130.167320.3815
Pluralistic return0.37671938.127973.0130