Research Article

Research on the Prediction of the Water Demand of Construction Engineering Based on the BP Neural Network

Table 6

Prediction results of different models.

TimeBP (%)PSO-BP (%)GA-BP (%)Pluralistic return (%)

21 June2.291.131.3232.38
22 June26.100.332.5835.55
23 June15.060.733.716.33
24 June45.021.848.3614.49
25 June12.352.053.6770.33
26 June21.231.131.7675.47
27 June17.824.433.4635.51
28 June25.534.741.6344.53
29 June11.994.196.8965.58
30 June46.564.187.1735.91