Research Article

Research on the Prediction of the Water Demand of Construction Engineering Based on the BP Neural Network

Table 8

Calculation results with different numbers of input variables.

Input variablesAverage error (%)Maximum error (%)

r1, r2, r4, and r54.064.74
r1, r2, and r47.4310.15
r1, r2, and r59.5514.28
r1, r4, and r58.9015.69
r2, r4, and r57.0512.73
r1, r2, r3, r4, and r53.674.21
r1, r2, r3, r4, r5, and r63.313.96