Research Article

Flowchart of DEM Modeling Stability Analysis of Large Underground Powerhouse Caverns

Figure 1

Sites selected for the investigation. The locations of three hydropower stations (a). The transformer chamber of Dagangshan station (b). The main powerhouse of Qiongzhong station (c). The traffic tunnel of Jurong station (d).