Cause Analysis of Hindering On-Site Lean Construction for Prefabricated Buildings and Corresponding Organizational Capability Evaluation
Table 6
Weights and rankings of thirty original observable variables.
| Code | Weight (%) | Ranking |
| B1 | 3.170 | 24 | B2 | 2.660 | 30 | B3 | 3.153 | 26 | B4 | 3.221 | 21 | B5 | 3.351 | 16 | B6 | 3.283 | 19 | B7 | 3.045 | 28 | B8 | 3.611 | 3 | B9 | 3.589 | 4 | B10 | 3.657 | 1 | B11 | 3.532 | 7 | B13 | 3.045 | 29 | B14 | 3.249 | 20 | B15 | 3.543 | 5 | B16 | 3.628 | 2 | B17 | 3.391 | 15 | B18 | 3.407 | 13 | B19 | 3.492 | 8 | B20 | 3.289 | 18 | B21 | 3.424 | 12 | B22 | 3.543 | 6 | B23 | 3.430 | 11 | B24 | 3.475 | 9 | B25 | 3.068 | 27 | B26 | 3.181 | 23 | B27 | 3.306 | 17 | B28 | 3.221 | 22 | B29 | 3.158 | 25 | B30 | 3.470 | 10 | B31 | 3.407 | 14 |
|
|